Nkweya & Sons

Services

Structural supervision

On-site engineering oversight ensuring designs are followed and structural work meets standard.

What is included

  • Review of the structural drawings against the soil report
  • Inspection of reinforcement before every concrete pour
  • Checks on concrete mix, cover, curing and formwork
  • Verification of setting out, levels and column positions
  • Written stage reports with dated photographs
  • A defects list you can put in front of your builder

What is not included

Stated up front so that scope is clear before work begins.

  • Carrying out the building work itself
  • Managing or paying your builder’s labour and suppliers
  • Architectural design or planning applications
  • Legal action against a contractor on your behalf
  • Continuous presence on site — inspections are at agreed hold points

On site

Part of

Structural supervision

  • Slab reinforcement, before the pour

    Slab reinforcement, before the pour

    Reinforcement mesh tied out over the formwork with the electrical conduit already run through it. A slab can be inspected at this moment and at no later one — an hour on, it is under concrete. This is the hold point structural supervision exists for.

  • Concrete cube on the compression machine

    Concrete cube on the compression machine

    A concrete cube crushed on a compression testing machine to establish the strength the mix actually reached. Specifying a concrete grade is straightforward; testing is how the batch is shown to have delivered it.

Questions

I already have a builder. Why would I pay someone else as well?

Because the things that go wrong structurally are invisible a week later. Reinforcement is checkable for a few hours before a pour and never again. Supervision is an independent pair of qualified eyes at the moments that cannot be revisited.

Will this put me in conflict with my builder?

A competent builder generally welcomes it — the reports document that the work was done properly, which protects them too. Tell them at the start rather than sending an engineer to the site unannounced.

At what point in a build should supervision start?

Before the foundation is poured, ideally before it is excavated. Coming in at finishing stage means everything that matters structurally is already buried.

What do I actually receive?

A written report at each agreed inspection point, with dated photographs, stating what was checked, what conformed, and what did not — in language you can hand to your builder without needing an engineer to interpret it.

Tell us what you want to build

Start with a message or a call, and we will arrange a site visit.

+237 656 766 513
WhatsAppCallContact